
Using reports for ACD planning
138 BCMS Operations
80 52.68 54.07 56.07 57.75 59.60 62.35 64.71 67.31 71.08
90 60.92 62.42 64.60 66.42 68.42 71.40 73.94 76.74 80.76
100 69.26 70.87 73.21 75.17 77.31 80.51 83.22 86.21 90.48
125 90.47 92.35 95.07 97.33 99.82 103.5 106.6 110.1 114.9
150 112.1 114.2 117.3 119.8 122.6 126.8 130.3 134.1 139.4
175 134.0 136.3 139.7 142.5 145.6 150.2 154.0 158.2 163.9
200 156.2 158.7 162.4 165.5 168.8 173.8 177.9 182.4 188.6
225 178.5 181.3 185.2 188.5 192.1 197.5 201.9 206.7 213.3
250 201.0 203.9 208.2 211.7 215.6 221.3 226.0 231.1 238.0
275 223.7 226.8 231.3 235.0 239.1 245.1 250.2 255.5 262.7
300 246.4 249.7 254.4 258.4 262.7 269.1 274.4 280.0 287.5
400 338.4 342.3 347.9 352.6 357.8 365.3 371.6 378.2 386.7
500 431.4 435.9 442.3 447.7 453.6 462.2 469.3 476.7 486.2
600 525.1 530.1 537.3 543.4 549.9 559.5 567.3 575.5 585.7
700 619.4 624.9 632.8 639.4 646.6 657.1 665.6 674.5 685.4
800 714.2 720.1 728.7 735.8 743.6 754.9 764.1 773.5 785.1
900 809.3 815.7 824.9 832.5 840.8 852.9 862.7 872.7 884.8
1000 904.7 911.5 921.3 929.4 938.2 951.1 961.5 972.0 984.6
1100 1000 1008 1018 1026 1036 1049 1060 1071 1084
1200 1096 1104 1115 1124 1134 1148 1159 1171 1184
1300 1192 1200 1212 1221 1231 1246 1258 1270 1284
1400 1289 1297 1309 1319 1329 1345 1357 1370 1384
1500 1385 1394 1406 1416 1427 1444 1456 1469 1484
1600 1482 1490 1503 1514 1526 1542 1556 1569 1584
1700 1578 1587 1601 1612 1624 1641 1655 1668 1684
ACD trunk engineering table (continued)
Number
of
trunks
Blocking probability
0.01% 0.02% 0.05% 0.10% 0.20% 0.50% 1.00% 2.00% 5.00%
Kommentare zu diesen Handbüchern