# Description Section
SD card before it is installed in the
control unit.
6 Prepare the base and trunk cards
and install them in the control
unit.
See Base and trunk card installation on
page 59.
7 Do one of the following:
• Install the control unit on the
wall.
• Install the control unit in a rack.
See one of the following:
Wall mounting on page 65.
Rack mounting on page 67.
8 Connect the external expansion
modules.
See External expansion modules on
page 69.
9 Connect the control unit and
external expansion modules to a
functional ground.
See Grounding on page 71.
10 Install the B5800 Branch Gateway
administration applications on the
installer PC.
See Installing the administration
applications on page 79.
11 Connect the PC to the control
unit.
See Installer PC connection on page 79.
12 Apply power to the system. See Applying power to the system on
page 81.
13 Use the initial installation utility to
configure a default configuration
and security settings.
See Using the Initial Installation Utility on
page 121.
15 Connect the control unit to the
network.
See Connecting the control unit to the
network on page 86.
18 Connect the phones. See Connecting phones on page 87.
Tools and equipment required
Following is a general summary of the tools required. Additional tools and equipment are
required for wall and/or rack mounting and to fashion ground cable connections suitable to
local requirements.
Tools required
- 5mm Flat-blade screwdriver
- Crosshead screwdriver
Hardware and software installation
54 Implementing the Avaya B5800 Branch Gateway for an Avaya Aura
®
Configuration October 2012
Seitenansicht 53
1 2 ... 49 50 51 52 53 54 55 56 57 58 59 ... 313 314

Kommentare zu diesen Handbüchern

Keine Kommentare