Environmental requirements
The planned location must meet the following requirements. If being installed into a rack
system, these are requirements for within the rack:
• Temperature: 0°C to 40°C / 32°F to 104°F.
• Humidity: 10% to 95% non-condensing.
• Check there are no flammable materials in the area.
• Check there is no possibility of flooding.
• Check that no other machinery or equipment needs to be moved first.
• Check that it is not an excessively dusty atmosphere.
• Check that the area is unlikely to suffer rapid changes in temperature and humidity.
• Check for the proximity of strong magnetic fields, sources of radio frequency and other
electrical interference.
• Check there are no corrosive chemicals or gasses.
Check there is no excessive vibration or potential of excessive vibration, especially of any
mounting surface.
• Check that where telephones are installed in another building, that the appropriate
protectors and protective grounds are fitted (see
Out of Building Telephone Installation on
page 74).
• Check there is suitable lighting for installation, system programming and future
maintenance.
• Check that there is sufficient working space for installation and future maintenance.
• Ensure that likely activities near the system will not cause any problems, e.g. access to
and maintenance of any other equipment in the area.
• Where ventilation holes are present on any of the B5800 Branch Gateway units, those
holes should not be covered or blocked.
• The surface must be flat horizontal for free-standing or rack mounted installations.
Wall mounting: In additional to the requirements above, the following are applicable to control
units that are mounted on the wall.
• Units must only be mounted onto permanent wall surfaces.
• The surface must be vertical and flat.
• Orientation of the unit must be as shown in the section on
IP500 Wall Mounting on
page 67.
• The appropriate Avaya wall mounting kits must be used.
Environmental requirements
Implementing B5800 Branch Gateway for a CS 1000 Configuration October 2012 49
Seitenansicht 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 323 324

Kommentare zu diesen Handbüchern

Keine Kommentare