Avaya B5800 Bedienungsanleitung Seite 57

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 324
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 56
- If wall mounting, drills and tools for wall mounting fixtures
Additional parts required
In addition to orderable system equipment, the following items are required.
- 14AWG solid copper wire for ground connection of control units and expansion
modules
- Cable sleeve matching local regulator requirements for ground wires. Typically green
for a functional ground and green/yellow for a protective ground.
- If wall mounting, additional 4.5mm diameter fixtures and fittings suitable for the wall
type
- Cable ties and labels for tidying and identifying cables
PC requirements
- Windows PC with the administration software installed. See
PC requirements on
page 80.
- SD card reader
Unpacking equipment
About this task
Use the following procedure when unpacking any equipment supplied by Avaya or an Avaya
reseller or distributor. Have the equipment order checklist available as you unpack the
equipment to ensure you have all parts and equipment ordered.
Procedure
1. Check for package damage
Before unpacking any equipment, check for any signs of damage that may have
occurred during transit. If any damage exists bring it to the attention of the carrier.
2. Check the correct parts have been delivered
Check all cartons against the packing slip and ensure that you have the correct
items. Report any errors or omissions to the equipment supplier.
3. Retain all packaging and documentation
While unpacking the equipment, retain all the packaging material. Fault returns are
accepted only if repackaged in the original packaging. If performing a staged
installation, the original packaging will also assist when repacking equipment to be
moved to the final install site.
4. Ensure that anti-static protection measures areobserved
Ensure that anti-static protection measures are observed at all times when handling
equipment with exposed electrical circuit boards.
Unpacking equipment
Implementing B5800 Branch Gateway for a CS 1000 Configuration October 2012 57
Seitenansicht 56
1 2 ... 52 53 54 55 56 57 58 59 60 61 62 ... 323 324

Kommentare zu diesen Handbüchern

Keine Kommentare