
Configuring Dial Services
12-10
308621-14.00 Rev 00
Using the BCC
To terminate the demand circuit based on inactivity, navigate to the
demand-circuit prompt and enter:
inactivity-time
<integer>
integer
is the number of seconds from 1 to 99,999,999.
The value you set is the amount of time that the router waits before deactivating
the switched connection.
For example, to set the inactivity time for circuit-to-Boston, enter:
demand-circuit/circuit-to-Boston# inactivity-time 120
If you want the connection to remain active at all times, enter 99,999,999. The
connection remains active unless the network deactivates the connection. If the
connection is deactivated, the router redials the same number when the next
packet is ready for transmission. You can also manually force the router to
establish a connection if a line is available using the
force-dial command.
Using Site Manager
To terminate the demand circuit based on inactivity:
Site Manager Procedure
You do this System responds
1. In the Configuration Manager window,
choose
Dialup
.
The Dialup menu opens.
2. Choose
Demand Circuits
. The Demand Pools window opens.
3. Click on
PPP Circuits
or
FR Circuits
. The PPP Demand Circuits window or the
FR Demand Circuits window opens.
4. Select the circuit that you want to modify.
5. Set the
Inactivity Time
parameter. Click
on
Help
or see the parameter description
on page A-36.
6. Click on
Apply
, then click on
Done
. You return to the Demand Pools window.
7. Click on
Done
. You return to the Configuration Manager
window.
Kommentare zu diesen Handbüchern